Hydrapower Dynamics Batch Wet Paint Spraying / Powder Coating Facility cw Off-Line Pre-Heating Chamber

Our client, a respected multi-national tier one automotive company, is vacating one of their factories.
As a consequence the following facility has become available and is being sold initially by private treaty:
A 2011 Hydrapower Dynamics Batch Wet Paint Spraying / Powder Coating Facility
Complete with Off-Line Pre-Heating Chamber
This facility, and / or parts of it, will be of interest to the following sectors, where larger parts are being painted / powder coated on a batch basis and a top quality finish is vital:
- Automotive Sector
- Aerospace Sector
- Medical Equipment Sector
- Commercial Vehicle
- Earthmoving Equipment
- Agricultural Machinery
- And others where the user needs to paint and / or powder coat large items manually in a controlled environment.
The overall footprint of stages 2, 3 and 4 is a nominal 18 metres (length) by 6.5 metres (width) by 6 metres (Height).
Offers are sought for the Spraying/Powder Coating Facility and Pre-Heating Chamber separately, and / or for the entire facility.
PLEASE NOTE that the entire facility must be removed by the end of October 2020.
Inspection welcome
Location: Shropshire
Available immediately.
Buyer’s premium of 11% will be added onto successful bid(s)
Stage 1 – Pre-Heating Chamber – THIS IS AN OFFLINE CHAMBER
This chamber produces hot, clean air by way of a packaged Comtherm gas burner which fires heat into the chamber and directed onto a large steel plate. That heat is then drawn through a series of High Efficiency Filters by way of a fan which then draws HOT, CLEAN AIR into the spraying / powder coating chamber and flash-off zone.
The floor dimensions of this chamber are 7600 x 2150 x 3200 – L x H x W
As this is an offline chamber it could be sold separately and slotted into an existing wet spray coating facility where clean air is essential to the spraying environment.
Stage 2 – Wet Spray / Powder Coating Chamber
Although this chamber appears to have originally been designed as a wet spray chamber, our client has carried out low volume powder coating in it very successfully as can be witnessed by the finish they are producing.
Excess powder simply falls to the floor and is swept up and taken away as trade waste. This makes the chamber flexible to those users who want the best of both worlds ie the ability to wet spray paint and / or powder coat in one chamber, saving space and cost!
Product is pushed into the chamber on loading bogeys through a powered roller shutter door.
There are four LEVs positioned outside the chamber (2 each side).
Heat is ducted in from the Pre-Heating Chamber via roof mounted grills.
The chamber is well lit with fluorescent lighting.
There are 2 Powder Coating Display Modules inside this chamber, currently only one manual Powder Coating Gun is being used. This is fed by a single outside ITW Powder Coating Box Fed Unit. There is NO Powder Coating Cyclone. There is NO dust extractor.
The Internal Floor Dimensions of this Chamber are – 6800 x 2320 (roller shutter door) x 2470 (roller shutter door) – L x H x W.
The chamber can also be accessed via a pedestrian door at the rear.
Stage 3 – Wet Spray “Flash-Off” / Powder Coated Holding Area
This stage is connected and in line with Stage 2 but separated by a powered roller shutter door.
This area is a simple wet paint flash off area or holding area before the components enter the curing oven.
Heat is ducted in from the Pre-Heating Chamber via a series of floor mounted vents.
The Internal Floor Dimensions of this chamber are 5600 x 2320 (roller shutter door) x 2470 (roller shutter door) L x H x W.
This chamber can also be accessed via a pedestrian door mid-way along its length.
Stage 4 – Final Curing
This stage is in line and connected to stage 3 but separated by a heat insulated pneumatically actuated door.
Heat is produced via a packaged Comtherm burner and drawn into side wall mounted heat spigots positioned on both sides of the chamber for heat uniformity.
The products are left at the set time and temperature, which in our client’s case is an air temperature of 200 Deg C.
On completion of the curing cycle there is a guillotine type vertical rising exit door where the operator enters and manually pushes / pulls the product out. This could be done by rigging a rope system and removing heavy components via a fork lift truck.
There is a pedestrian access door located approximately midway on the outside of this stage.
The floor dimensions of this chamber are 5400 x 2320 (roller shutter door) x 2470 (roller shutter door). L x H x W . The vertical door rises to an approximate 6000mm in height when fully open when the parts are being unloaded so be sure to have the height to accommodate.
The overall footprint of stages 2, 3 and 4 is a nominal 18 metres (length) by 6.5 metres (width) by 6 metres (Height)
LEV
The whole system is exhausted to air by a well engineered LEV facility that sees a central vertical exhaust stack extend some 60ft before it exits the roof (Note this was only done as our client could not exit the stack via any other route, buyers could exit it lower).
CONTROL AND INSTRUMENTATION
A central control station provides all the means of temperature control and operation of the system.
PLEASE NOTE that the entire facility must be removed by the end of October 2020.
Our client will make all necessary utility disconnections. The Buyer will be responsible for dismantling and removal only. RAMS will be a feature of the decommissioning and removal. Covid-19 measures will be in place.
Please note that Buyer’s Premium of 11% will be added on to any successful offer, when invoiced.
In the event that these items do not sell by private treaty they will be placed in a short notice online timed auction through Bidspotter. If that happens the Buyer’s premium will increase to 16%.
Please note that the parts handling manipulator seen in some of the images is not included in the sale.
These items are in Shropshire.